Drinking Water Permits

 

| Contacts | Process Overview | Time Required |

 


Water systems serving 25 or more people for more than 60-days yearly, or having 15 or more residential connections year-round, are subject to Utah Public Drinking Water Rules and must obtain a permit known as an approval.

 

Process Overview

 

Systems developing their own water supply must meet state standards by submitting proof of adequate water rights, organic and inorganic water chemistry, radiologic and bacteriological quality, adequate source yield and water source protection from concentrated pollution.

If connecting to an existing water system, explain expected demand, including number of people, fire protection and other uses; and existing water system's supply capability.

Applicants prepare plans after the Division verifies the above provisions. The Utah Public Drinking Water Rules' construction standards must be followed. On-going sampling and inspection are required.

Water hauling is prohibited for community systems or for those serving 25 or more year-round residents. Water hauling may be permitted for non-community systems if:

Top


Time Required

 

At least 30 days, may take longer depending upon original application's completeness.

Top


Contacts

 

Director, DEQ Division of Drinking Water
150 North 1950 West
P.O. Box 144830
Salt Lake City, Utah 84114-4830
Telephone: 801-536-4200
Fax: 801-536-4211

Top

 

Revised: November 2, 2009