DEQ Home > GSL WQ Steering Committee > Instructions
General Contractor Instructions to Principal Investigators
and Laboratories
Data Quality Objectives
- Developing a Site-specific Selenium Standard for Great Salt Lake
- Great Salt Lake Project 2A: Synoptic Survey of Selenium in Periphyton and Brine Fly Larvae from the Benthic Zone of the Great Salt Lake (Preliminary Study)
- Great Salt Lake Project 2B: Synoptic Survey of Selenium in Water, Seston, and Artemia
- Great Salt Lake Project 3: Measurement and Modeling of Selenium Loads to Great Salt Lake
- Great Salt Lake Project 4: Measurement of Selenium Flux
- Great Salt Lake Project 5: Predictions of Selenium Accumulation in Artemia franciscana Under Conditions Realistic for the Populations Residing in the Great Salt Lake
- Project 1A: Concentration and Effects of Selenium in Shorebirds
- Project 1B: Concentrations and Effects of Selenium in Gulls, Grebes, and Ducks
Standard Operating Procedures
- Avian Diet Sampling
- Avian Egg Collection
- Determination of Dietary Selenium Intake and Assimilation Efficiency: Brine Shrimp Kinetics Study
- Determination of Water-borne Selenium Assimilation Efficiency
- Dietary Acclimation Experiment: Brine Shrimp Kinetics Study
- Egg Breakout
- Feeding Rate Experiment: Brine Shrimp Kinetics Study
- Flow Measurement
- Harvest of Adult Birds
- Sampling of Benthic Zone
- Sediment Trap Samples
- Sediment via Eckman Dredge
- Seston Sampling
- Total and Dissolved Water Samples
- Total Dissolved Gas
- Uptake From Water; Se-75: Brine Shrimp Kinetics Study
- Volatile Selenium
- Water Acclimation Experiment: Brine Shrimp Kinetics Study
Other Documents

