DEQ Home > Issues > Kennecott Project > Stakeholder Forum Meetings
Issues
Kennecott Project: Stakeholder Forum Meetings
On a regular basis, DEQ, the District, and Kennecott sit down with representatives of various community groups to provide project updates. The Stakeholder Forum assists with the dissemination of the information about the various CERCLA and NRD project aspects at Kennecott Utah Copper.
Next Meeting
The next meeting of the Stakeholder Forum will be held on:
Check back for the details of the next meeting.
If you would like to receive meeting notices, please sign up on the Listserv.
Prior Meetings
2010 Meetings
March 17, 2010
Project updates.
- Agenda | Attendance List
- Groundwater Recharge, Movement, and Discharge in Salt Lake Valley
- Draft—Kennecott South Facilities Groundwater Remediation 2009 Progress Report
- Overview of the Design and Construction Activities for Zone B: Southwest Jordan Valley Groundwater Project: 1 of 3
- Overview of the Design and Construction Activities for Zone B: Southwest Jordan Valley Groundwater Project: 2 of 3
- Overview of the Design and Construction Activities for Zone B: Southwest Jordan Valley Groundwater Project: 3 of 3
- Southwest Groundwater Treatment Plant Proposed UPDES Permit
- UPDES Permit for Discharge of Reverse Osmosis By-products to Great Salt Lake
2007 Meetings
June 20, 2007
Project updates.
- Agenda | Attendance List
- 2007 Work Planned and In Progress: DEQ
- Annual Monitoring Report: Kennecott
- CERCLA OU2 Remedial Design Consent Decree: DEQ
- Groundwater Project Update: JVWCD
2006 Meetings
August 2, 2006
Project updates.
- Agenda | Attendance List
- Annual Monitoring Report: Kennecott
- Update on Great Salt Lake Study: DEQ
- Osmosis Plant Startup: JVWCD
- 2006 Work Planned and In Progress: DEQ
- UPDES Permit Status: DEQ
Spring 2006
Bingham Canyon reverse osmosis plant tour.
- About the SWJV Groundwater Project: JVWCD
- Actions on Behalf of the Public: DEQ
- Bingham Canyon Water Treatment Plant Water Quality and Assurance: JVWCD
- How the New Water Source Will Be Delivered: JVWCD
- Project Facilities Map
- Utah's First Municipal Reverse Osmosis Plant Readies for Operation: JVWCD
2005 Meetings
October 12, 2005
Update on latest activities and completions.
- Agenda Attendance List
- Great Salt Lake Study Update: DEQ
- Kennecott North Facilities Remediation—Stakeholder Forum Update: Kennecott
- South Facilities Groundwater Remediation—Annual Progress Report: Kennecott
- Southwest Jordan Valley Groundwater Project: JVWCD
- Status of OU2 Consent Decree: DEQ
January 12, 2005
Updates: Great Salt Lake Selenium Project, JVWCD Project schedule, and Consent Decree process.
- Agenda | Attendance List
- Kennecott and the Environment: Working to Cleanup and Protect: DEQ
- Remedial Design Consent Decrees: Their Purpose and Process: DEQ
- Remedial Design Consent Decrees: Their Purpose and Process: Presentation: DEQ
- Selenium Steering Committee and Science Panel Update: DEQ
- Status report and schedule outlook for Jordan Valley Groundwater Treatment Project: JVWC
2004 Meetings
June 16, 2004
Joint Stakeholder TRC Meeting -Revised Cleanup Proposal, Planned Public Process
- Agenda
- Addendum to Appendix D: Revised Flow and Transport Model, Southwestern Jordan Valley, Utah; June 11, 2004: Kennecott
- Appendix H: Pilot Study Final Report: Carollo Engineers
- Model Predicted Layer for Sulfate Year 2025 (Figure 6.3 A): Map
- Model Predicted Layer for Sulfate Year 2050 (Figure 6.3 B): Map
- Proposed Groundwater Extraction and Treatment System (Figure 5.2A): Map
- Proposal to the Utah State NRD Trustee and US EPA CERCLA Remedial Project Manager for a Groundwater Extraction and Treatment Remedial Project in the Southwestern Jordan Valley: Kennecott and JVWCD
- Report to Public; June 2004: DEQ
- Summary of Changes to Figures: Joint Proposal Draft
- Zone A Plume—Treatment (Figure 5.4A)
- Zone A Remedial Activities Update—June 16, 2004: Kennecott
- Zone B and Lost Use Integrated Design (Figure 5.4B), Zone B and Lost Use Minimum Integrated Design (Figure 5.4 C), and Zone B and Lost Use Separate Design (Figure 5.4 D)
- Zone B Design Options—June 16, 2004: JVWCD
May 19, 2004
Updates from other related meetings and identify next topics of focus.
- Agenda | Attendance List
- Draft Issues List (Grouped by Topic): Facilitated Discussion
- Friends of the Great Salt Lake Position Paper on Water Quality Standards for the Great Salt Lake
- Jordan Valley Water Conservancy District Recommendation on Southwest Groundwater Treatment Project
- Jordan Valley Water Conservancy District Recommendation to Modify Joint Proposal
April 14, 2004
Alternatives Analysis, Science of the Great Salt Lake.
- Agenda | Attendance List
- Cost Estimate for Disposal of Reverse Osmosis By-Product—Alternative 1—Discharge of Zone B to KUCC Tailings Pipeline; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative 1.1—Zone B Discharge to the KUCC Tailings Pipeline; Lost Use Discharge to GSL; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative 1.2—Zone B Discharge to the KUCC Tailings Pipeline; Lost Use Discharge to KUCC GSL Outfall; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative 1.3—Zone B Discharge to the KUCC Tailings Pipeline; Lost Use Distillation; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative F.1—Zone B Discharge to Tailings Impoundment; Lost Use Discharge to Great Salt Lake"; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative F.2—Discharge Zone B to KUCC Tailings Impoundment; Discharge Lost Use to KUCC GSL Outfall; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative F.3—Zone B Discharge to KUCC Tailings Impoundment; Lost Use Distillation; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-Product; Alternative D—Discharge to the Great Salt Lake; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative E—Discharge to KUCC GSL Outfall; April 13, 2004: JVWCD
- Cost Estimate for Disposal of Reverse Osmosis By-product; Alternative F—Discharge of Zone B by-product to KUCC Tailings Impoundment; April 13, 2004: JVWCD
- Evaluation of Alternatives for Disposal of Zone B Reverse Osmosis By-product to KUCC Facilities; April 13, 2004: Kennecott
- Evaluation of Disposal of Reverse Osmosis By-Product—Alternative H—Distillation and Disposal of Salts; April 12, 2004: Ch2Mill
- Evaluation of Disposal of Reverse Osmosis By-Product; Biological Treatment for Selenium Removal; April 13, 2004: Carollo Engineers
- Deep Well Injection: Regulatory and Hydrogeolocial/Geochemical Feasibility; April 13, 2004: DEQ
- Evaluation of Disposal of Reverse Osmosis By-product; Selection of Reverse Osmosis; April 13, 2004: Carollo Engineers
- Evaluation of Reverse Osmosis By-product Disposal; Alternative H—Disposal to a Landfill by Thermal Zero Liquid Discharge Processing; April 13, 2004: Carollo Engineers
- Figure 1: Example ZLD Process Flow Diagram: Tech Memo No. 6: JVWCD
- Preliminary Investigation of Selenium in Water, Bottom Sediment, and Biota
- Project Costs and Impact to JVWCD Water Rates - Zone B Lost Use Reverse Osmosis By-product disposal Alternatives; Southwest Jordan Valley Groundwater Remediation Project Stakeholders Forum; April 13, 2004: JVWCD
- Reverse Osmosis By-Product Disposal and Estimates; April 14, 2004
- Secondary Water Deliveries Alternative; Zone B/Lost Use Reverse Osmosis By-product Disposal Alternatives; Southwest Jordan Valley Groundwater Remediation Project Stakeholders Forum; April 8, 2004: JVWCD
- Trace Level Selenium Analysis in High Brine Matrix; April 14, 2004
March 31, 2004
Alternatives and criteria comparison.
- Agenda | Attendance List
- Alternatives; March 31, 2004
- Alternatives and Criteria Comparison Chart
- Alternatives and Criteria Comparison Chart: HTML Version
- Summarized Criteria and Group Concerns, Requests, and Suggestions
March 17, 2004
Organizational meeting.
- Agenda | Forum Members
- Disposal Alternatives
- Meeting Attendees and Factors Raised: Summary
- Reverse Osmosis; March 17, 2004
- Stakeholder Forum Purpose and Goals
Related Documents
The following documents have been referenced during Forum discussions. Placement on this page is for information purposes only and should not be interpreted as having been condoned, supported, or reviewed by DEQ.
Selenium-Related Studies
- Analysis of Field and Laboratory Data to Derive Selenium Toxicity Thresholds for Birds: Environmental Toxicology and Chemistry, Vol. 22, No. 9 pp.2028-2029 - 2003: Kennecott
- Chronic Toxicity of Arsenic to Great Salt Lake Brine Shrimp: 2002 Article in Ecotoxicology and Environmental Safety: Kennecott
- Great Salt Lake Water Quality Steering Committee Website
- Implications of Selenium in Proposed Wastewater Discharges to Great Salt Lake; January 30, 2004: USDA/Forest Service
- Preliminary Investigation of Selenium in Water, Bottom Sediment, and Biota, Great Salt Lake Utah: USFWS/USGS (Abstract)
- Results for Method Development and Analytical Services for Water Samples from the Great Salt Lake: Frontier Geosciences; Prepared for Bill Adams, Undated: Kennecott
- Site-Specific Approach for Setting Water Quality Criteria for Selenium: Differences Between Lotic and Lentic Systems: Presentation at Ministry of Energy and Mines Mine Reclamation Symposium; June 21-22, 2000: Kennecott
- Site-Specific Water Quality Standard for Selenium: Kennecott
- Trace Level Selenium Analysis in High Brine Matrix: Kennecott